Engineered roof trusses help builders create a coordinated structural package for California and Nevada projects. The process typically includes confirming project requirements, reviewing architectural and structural drawings, completing truss layouts and calculations, preparing submittals, managing revisions, and coordinating manufacturing so components arrive ready for the planned framing sequence.

Subtitle: A practical guide for builders, developers, general contractors, and design teams.

Engineered roof trusses reviewed with construction drawings

What project information is needed for engineered roof trusses?

Accurate roof truss planning starts with a complete project information package. The manufacturer and design team need enough detail to understand how the roof system connects to the rest of the building and how it will be installed.

Typical requirements include:

  • Architectural roof plans, floor plans, elevations, and building sections
  • Structural drawings, specifications, design criteria, and applicable code information
  • Roof geometry, slopes, overhangs, hips, valleys, dormers, and other special conditions
  • Bearing locations, wall lines, girder truss locations, and required openings
  • Dead loads, live loads, wind loads, snow loads, and other project-specific criteria
  • Roof coverings, ceiling materials, mechanical equipment, photovoltaic systems, and concentrated loads
  • Site access, delivery constraints, crane or installation requirements, and target framing dates

Requirements can vary by jurisdiction, building type, and project design. California and Nevada projects may also involve different local review expectations and site-specific loading conditions. The design team remains responsible for establishing the project’s governing criteria and approving the final engineered package.

For broader planning support, review Aldac’s engineering and pre-construction support services .

How does drawing review prevent coordination problems?

Drawing review is the opportunity to identify conflicts before fabrication. A focused review compares architectural intent, structural requirements, and constructability rather than treating the roof plan as an isolated document.

The review should confirm:

  1. Bearing alignment: Truss reactions land on intended walls, beams, or other supports.
  2. Openings and penetrations: Attic access, skylights, mechanical openings, and special penetrations are identified early.
  3. Elevation coordination: Truss profiles work with parapets, fascia, ceiling changes, and adjacent roof areas.
  4. Connection conditions: Girder trusses, hangers, blocking, and load-transfer points are shown consistently.
  5. Trade coordination: Ductwork, plumbing, electrical equipment, and rooftop systems have adequate space.

Questions discovered during review should be documented and assigned to the appropriate design or construction participant. Resolving ambiguity before layout and fabrication can reduce avoidable revisions and field modifications.

Truss layout and calculations

A truss layout translates the building design into a coordinated map of individual components. It typically identifies truss marks, spacing, orientation, bearing points, girder locations, openings, bracing notes, and special conditions.

Calculations then evaluate each truss for the loads and geometry defined by the project. Depending on the design, the package may address standard common trusses, girder trusses, hip trusses, piggyback conditions, valley sets, or other framing components.

A useful coordination checklist includes:

  • Confirm truss spacing and orientation against the framing plan.
  • Verify support locations and reactions with the structural design.
  • Identify any trusses requiring special handling or installation sequencing.
  • Review roof transitions, multiple slopes, and irregular framing zones.
  • Coordinate permanent bracing and temporary installation requirements with the responsible parties.

Engineered calculations support design coordination; they do not replace project-specific review by the architect, engineer of record, building official, or qualified installer.

Roof truss layout and calculations on a professional drafting workstation

What should a truss submittal include?

A truss submittal should give the project team enough information to review design intent, component placement, and installation coordination. The exact contents depend on the project and contract requirements, but a package commonly includes:

  • Truss placement plans and identification marks
  • Individual truss profiles and design information
  • Reactions, loads, spans, bearings, and relevant design criteria
  • Notes for bracing, connections, girder conditions, and special details
  • Manufacturer information and product specifications where required
  • Clarifications for assumptions, exclusions, unresolved conditions, or field coordination

Submittals should be reviewed by the designated project professionals. Approval may mean “approved,” “approved as noted,” or “revise and resubmit,” depending on the project’s process. It is important to distinguish submittal review from structural design responsibility and to document all comments clearly.

A clean submittal workflow generally looks like this:

  1. Collect the latest approved drawings and project criteria.
  2. Prepare the layout, component designs, and supporting information.
  3. Submit the package through the project’s required channel.
  4. Consolidate review comments and identify responsible responses.
  5. Revise the package and obtain the required approval before release.
  6. Distribute the approved or released-for-production information to the relevant teams.

How should revisions be managed before manufacturing?

Revision control is essential because even a small change to a bearing wall, roof opening, elevation, or load can affect several trusses. Every revision should be traceable to a drawing date, revision mark, request, or approved design change.

When drawings change, the team should determine:

  • What changed and which truss marks are affected
  • Whether calculations, reactions, layouts, or details must be updated
  • Whether previously approved information is still valid
  • Whether material has been purchased, cut, assembled, or shipped
  • Which parties must review and approve the change

Avoid relying on informal messages or superseded plan sets. Use a controlled document process and communicate the current revision to the design team, manufacturer, site superintendent, and framing contractor. This approach helps prevent outdated components from entering production or arriving at the jobsite.

Manufacturing coordination and delivery planning

Manufacturing coordination connects approved design information to physical production. Before release, the project team should confirm the production set, quantities, truss marks, delivery sequence, packaging, and site readiness.

Important coordination points include:

  • Release only the current, approved information for production.
  • Confirm quantities and identify any multiple-phase or area-by-area deliveries.
  • Coordinate delivery windows with site access, unloading space, and framing progress.
  • Identify long or unusual components that may require special handling.
  • Confirm who receives production questions and how field conditions are reported.

A manufacturer may flag conflicts or missing information, but field conditions should be evaluated by the appropriate project professionals. Aldac Components manufactures engineered roof trusses and related structural components for multifamily, mixed-use, hospitality, and production housing developments across California and Nevada. Explore truss design and manufacturing services to discuss project coordination.

Roof trusses organized for delivery to a multifamily construction project

Frequently asked questions

What are engineered roof trusses?

Engineered roof trusses are prefabricated structural framing components designed for specified spans, loads, geometry, and support conditions. Their design and use should follow the project documents, applicable requirements, and qualified professional review.

When should truss design begin?

Truss design should begin after the architectural and structural information is sufficiently developed to establish roof geometry, supports, loads, openings, and project criteria. Starting early supports coordination, but production should wait for the required approvals and current information.

Who approves a roof truss submittal?

The project’s contract documents determine the review and approval process. Typically, the architect, engineer of record, general contractor, or designated reviewer evaluates the submittal. Approval responsibilities should be confirmed before the package is prepared.

Can roof trusses be revised after manufacturing starts?

Revisions may be possible, but they can affect design, materials, production timing, delivery, and cost. Notify the manufacturer promptly, identify the affected components, and obtain the required technical and project approvals before proceeding.

Does Aldac Components serve projects outside Modesto?

Aldac Components is headquartered in Modesto and supports construction projects across California and Nevada. Builders can review the company’s service areas or contact Aldac Components with project location, drawings, schedule, and scope information.

Plan the next step

Engineered roof trusses are most effective when requirements, drawings, calculations, submittals, revisions, and manufacturing are coordinated as one process. Begin by assembling current project documents, confirming design criteria and review responsibilities, and identifying the schedule for approval and delivery. Then compare the manufacturer’s capabilities with the project’s geometry, building type, location, and installation needs. For California and Nevada builders, developers, and general contractors, Aldac Components can help evaluate the information needed to discuss a coordinated truss package. Contact the team early so design and manufacturing questions can be addressed before they affect the framing schedule.